Find references by:
Saipem project in the Gulf of Mexico
Customer Challenge: Installation of structures with large surfaces for Saipem in the Gulf of Mexico. Cranemaster Solution: A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke. The Results: The Cranemaster unit successfully absorbed the forces through the splash zone, avoided resonance and reduced landing speed. The use…
Met mast installations in the North Sea
Customer Challenge: Stabilization of met masts when lowering through the splash zone. The structures have a height of 45 meters and weights of 300-400 metric tons. Cranemaster Solution: Two Cranemater units with SWL of 400 metric tons and 2,5 meter stroke were used in parallell configuration. The Results: For this project…
Splash zone crossing of MWA module
Customer Challenge: Splash zone crossing of a Midwater Arch (MWA) for DOF Subsea at the Biendong Project in Vietnam. Cranemaster Solution: Cranemaster unit with SWL of 250 metric tons and 2,5 meter stroke.
Installation work with Boskalis at the Wikinger OWF
Customer Challenge: Reduction of risk and weather delays during installation of pre-piling template for Boskalis at the Wikinger Offshore Wind Farm. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke.
Mudmat safely installed in deep waters
Customer Challenge: Deployment of a large mudmat (13,75 x 13,75 meter) at 1788 meter water depth in the Gulf of Mexico. For ease of operation, the mudmat is deployed horizontally. Considerations to be handled by Cranemaster: The unit should have enough load capacity to support the dynamic loads during all…