Installation of module for Jumbo Maritime

Customer Challenge:

Installation of module for Jumbo Maritime at the Wheatstone Project. Max. landing speed of 0,5 m/s at 200 meter water depth.

Cranemaster Solution:

A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke. The unit was equipped with Lock & Release functionality for reduction of rigging height at lift off.