Cranemaster equipment was utilized on the GSP Bigfoot 1 vessel for a complex offshore pin pile installation in Romania, helping to address significant challenges related to vessel movement and equipment safety.
Customer Challenge
The operation required upending pin piles using a clamp at the rear of a feeder barge before transferring them into a vertical position with the installation crane, positioned at the starboard rear of the vessel Bigfoot 1. However, the relative motion between the two vessels posed risks of equipment damage and potential misalignment, making precision control essential.
Cranemasterโs Advanced Solution
To mitigate these risks, Cranemaster conducted a comprehensive lift analysis using Orcaflex simulation software to assess vessel movement and optimize load handling. Insights from this analysis led to fine-tuning the spring stiffness of the CM3-250T-2500-A Cranemaster unit, ensuring smoother operations and reducing impact forces during lifting.
Successful Outcome
Through meticulous planning, advanced modeling, and customized equipment adjustments, the pin pile installation was completed safely and efficiently, with no incidents. This project underscores Cranemasterโs expertise in offshore lift analysis and motion control, delivering optimized lifting solutions for complex maritime operations.
By leveraging cutting-edge engineering and precision planning, Cranemaster continues to enhance safety, efficiency, and reliability in offshore heavy lifting projects worldwide.