Customer Challenge:
Installation of structures with large surfaces for Saipem in the Gulf of Mexico.
Cranemaster Solution:
A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke.
The Results:
The Cranemaster unit successfully absorbed the forces through the splash zone, avoided resonance and reduced landing speed.
The use of Cranemaster was essential to obtain a reasonable operational weather window. Lift analysis was conducted by Cranemaster prior to the operations.