Cranemaster®'s Role in the He Dreiht Wind Farm Project
Cranemaster® supported Heerema Marine Contractors in installing 64 monopiles at the 960 MW He Dreiht wind farm, using shock absorbers to reduce risks during pile driving and protect equipment.