Installation at Greater Gabbard Offshore Wind Farm
CM3-400T-2500-A
|
Cranemaster®'s Role in the He Dreiht Wind Farm Project
|
Offshore wind
|
SBM Offshore selected Cranemaster® when installing floating wind turbines

Installation of transition pieces from floating vessels can be challenging. For the Greater Gabbard Offshore Wind Farm project off the UK coast in 2014, Jumbo Offshore included Cranemaster for the installation of transition pieces.