Installation at Greater Gabbard Offshore Wind Farm

Installation of transition pieces from floating vessels can be challenging. For the Greater Gabbard Offshore Wind Farm project off the UK coast in 2014, Jumbo Offshore included Cranemaster for the installation of transition pieces.

Cranemaster Solution

Two new Cranemaster units with SWL of 400 metric tons and 2.5 metre stroke was designed for this project.

To limit the lifting height above the ship deck, Lock & Release functionality was included. The Cranemaster unit was mainly used to reduce the crane wire tension and to ensure a safe landing of the transition pieces onto the piles offshore.

More Cranemaster heavy lifting in offshore wind

SBM Offshore selected Cranemaster® when installing floating wind turbines

Shock Absorbers | Pile Run Protection | CM3-700T-4500-A | CM3-400T-4200-A | CM3-400T-4200-B | Offshore wind

Cranemaster®'s Role in the He Dreiht Wind Farm Project

Shock Absorbers | Pile Run Protection

Get in touch

Our team is ready to help you find the optimal solution for your lifting operation. We offer customized solutions tailored to each project. Get in touch to discuss your specific needs and discover how Cranemaster© can enhance operational safety and extend weather windows.