Find references by:
Subsea 7 successfully installed protection covers in rough weather
Customer Challenge: Installation of GRP protection covers in rough weather in the Shetland waters for Subsea 7. Cranemaster Solution: A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke. The Results: Analysis was done upfront by Cranemaster, giving Subsea 7 a weather window of significant wave heights…
Saipem project in the Gulf of Mexico
Customer Challenge: Installation of structures with large surfaces for Saipem in the Gulf of Mexico. Cranemaster Solution: A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke. The Results: The Cranemaster unit successfully absorbed the forces through the splash zone, avoided resonance and reduced landing speed. The use…