Installation of module support frame
Customer Challenge: Installation of a Module Suport Frame (MSF) at 120 meter water depth for TechnipFMC and Jumbo at the North Amethyst project in Canada. The MSF had a dry weight of 139 metric tons and a submerged weight of 109 metric tons. Cranemaster Solution: A Cranemaster unit with SWL…
Structure installation at 2700 meter
Customer Challenge: Cross haul and landing of 167 metric tons piles, manifolds and pump stations for TechnipFMC USA. Cranemaster Solution: Two Cranemaster units in series with SWL of 250 metric tons and 2,5 meter stroke. The Results: The structures were successfully installed at 2700 meter water depth from the vessel…
Jumbo installs structures for Ikhwezi project
Customer Challenge: Deployment of five subsea structures for PetroSA’s Ikhwezi project, offshore South Africa. Cranemaster Solution: Two Cranemaster units with SWL of 250 metric tons and 2,5 meter stroke. The Results: The installation of the five structures, weighing between 35 and 185 metric tons and measure up to 14 x…
Splash zone crossing of MWA module
Customer Challenge: Splash zone crossing of a Midwater Arch (MWA) for DOF Subsea at the Biendong Project in Vietnam. Cranemaster Solution: Cranemaster unit with SWL of 250 metric tons and 2,5 meter stroke.