Find references by:
![Installation of module for Jumbo Maritime](https://cranemaster.com/wp-content/uploads/2020/08/References-offshore-installation-jumbo-wheatstone-passive-heave-compensation-splashzone-01.jpg)
Installation of module for Jumbo Maritime
Customer Challenge: Installation of module for Jumbo Maritime at the Wheatstone Project. Max. landing speed of 0,5 m/s at 200 meter water depth. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke. The unit was equipped with Lock & Release functionality for reduction of…
![Removal of 420 metric tons offshore bridge structure](https://cranemaster.com/wp-content/uploads/2020/08/References-offshore-removal-decom-retrieval-1.jpg)
Removal of 420 metric tons offshore bridge structure
Customer Challenge: Protection of the crane and the structure from shock loads during the removal process of a large offshore bridge structure of 420 metric tons in the North Sea. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke. The Results: Potential shock loads…
![Installation work with Boskalis at the Wikinger OWF](https://cranemaster.com/wp-content/uploads/2020/08/Boskalis-Wikinger-Offshore-wind-installation-splash-zone-crossing-passive-heave-compensator.jpg)
Installation work with Boskalis at the Wikinger OWF
Customer Challenge: Reduction of risk and weather delays during installation of pre-piling template for Boskalis at the Wikinger Offshore Wind Farm. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke.