Installation of the First Floating Wind Turbines in Provence
Cranemaster supported SBM Offshore with the installation of the company’s first three floating wind turbines in the Provence Grand Large pilot project. Our staff and units, CM3-700T-4500, played a pivotal role in ensuring a safe and efficient installation process located 17 km off the coast of Port-Saint-Louis-Du-Rhône in France.
Pile hammering for E.ON at the Rampion project
Customer Challenge: Pile run protection during installation of 116 monopiles at the Rampion Offshore Wind Farm Project off the south coast of England. Cranemaster Solution: Two Cranemaster shock absorbers with SWL of 1000 tons and 700 tons. Protecting the crane and rigging by reducing potential shock loads caused by sudden…
Installation of transition pieces at Greater Gabbard
Customer Challenge: Installation of transition pieces from floating vessels can be challenging. For the Greater Gabbard Offshore Wind Farm project off the UK coast, Jumbo Offshore therefore included Cranemaster for the installation of transition pieces. Cranemaster Solution: Two new Cranemaster units with SWL of 400 metric tons and 2,5 meter stroke was designed for…
Installation of large wave energy device
Customer Challenge: Installation of the wave energy device bioWAVE near Port Fairy, Victoria, in rough weather conditions. Cranemaster Solution: Two large Cranemaster passive heave compensators with SWL of 700 metric tons and 400 metric tons. The Results: The two Cranemaster units functioned perfectly, resulting in reduced DAF in the splash…
Met mast installations in the North Sea
Customer Challenge: Stabilization of met masts when lowering through the splash zone. The structures have a height of 45 meters and weights of 300-400 metric tons. Cranemaster Solution: Two Cranemater units with SWL of 400 metric tons and 2,5 meter stroke were used in parallell configuration. The Results: For this project…
Pile run protection for Humber Gateway
Customer Challenge: Removal of dangerous peak loads in case piles are “running” during piling operations for the Humber Gateway monopile installations. Cranemaster Solution: Three Cranemaster shock absorbers in parallel configuration for pile run protection. The Results: More than 10 pile runs were experienced during the project, but due to the Cranemaster units,…
Installation work with Boskalis at the Wikinger OWF
Customer Challenge: Reduction of risk and weather delays during installation of pre-piling template for Boskalis at the Wikinger Offshore Wind Farm. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke.