Find references by:
Transfer lift of a platform module
Customer Challenge: Lifting of a platform structure from a barge onto a platform. Cranemaster Solution: Two Cranemaster units in series with SWL of 400 metric tons and 4,3 meter stroke. Cranemaster Quick Lift functionality was used to avoid re-contact after lift off.
Removal of 420 metric tons offshore bridge structure
Customer Challenge: Protection of the crane and the structure from shock loads during the removal process of a large offshore bridge structure of 420 metric tons in the North Sea. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke. The Results: Potential shock loads…
Shock absorbers for lifeboats – NORSOK R002
Customer Challenge: Shock absorbers to be used on lifeboats for reduction of dynamic loads down to acceptable levels. Cranemaster Solution: 8 special designed Cranemaster shock absorbers with SWL of 25 metric tons. The units are designed according to the NORSOK-R002 directive, reducing dynamic loads down to an acceptable level.
Costa Concordia removal project
Customer Challenge: Costa Concordia removal project for Titan Micoperi. Cranemaster Solution: Support during transfer lifts in preparation of getting the Costa Concordia floating. The Results: For more details visit the project information site: http://www.theparbucklingproject.com/…
Lifting capacity increased for higher sea states
Customer Challenge: Increased lifting capacity for offshore rig on British sector. Cranemaster Solution: A Cranemaster unit with SWL of 100 metric tons and 1 meter stroke. The Results: The client was able to lift loads that exceeded the capable loads in their cranes original load chart.
Load chart with improved load curves
Customer Challenge: Lifting of a subsea x-mas tree with weights of 37 metric tons from a work boat to a semi submersible rig offshore New Zealand. Cranemaster Solution: A Cranemaster shock absorber with SWL of 100 metric tons and 1 meter stroke. A load chart with improved load curves was…
Load chart improvement for lifting of x-mas trees
Customer Challenge: Lifting of x-mas trees using a Seatrax 108 S10832 crane. Cranemaster Solution: Two Cranemaster® shock absorbers with SWL of 100 metric tons and 1 meter stroke in parallel configuration. The Results: Report from calculations shows significant improvement in the load chart values.