Find references by:
![Installation of PLEM modules in the South China Sea](https://cranemaster.com/wp-content/uploads/2020/08/PLEM-modules-installation-passive-heave-compensator-offshore-subsea-01.jpg)
Installation of PLEM modules in the South China Sea
Customer Challenge: Splash zone crossing and reduction in seabed landing velocity during installation of PLEM modules in the South China Sea. Cranemaster Solution: A Cranemaster passive heave compensator with SWL of 150 metric tons and 4,5 meter stroke. The Results: Due to the large horizontal area of the PLEM modules,…