Find references by:

Mudmat and manifold installation Western Australia with limited rigging height
Cranemaster supported TechnipFMC during installation of mudmats and manifolds with weight from 360 ton to 550 ton. Water depth during installations was 250m and 1300m. Customer challenge The primary challenge for the operation was the splash zone crossing with structures of very large surface areas. In addition,…

Installation of module for Jumbo Maritime
Customer Challenge: Installation of module for Jumbo Maritime at the Wheatstone Project. Max. landing speed of 0,5 m/s at 200 meter water depth. Cranemaster Solution: A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke. The unit was equipped with Lock & Release functionality for reduction of…

Installation of transition pieces at Greater Gabbard
Customer Challenge: Installation of transition pieces from floating vessels can be challenging. For the Greater Gabbard Offshore Wind Farm project off the UK coast, Jumbo Offshore therefore included Cranemaster for the installation of transition pieces. Cranemaster Solution: Two new Cranemaster units with SWL of 400 metric tons and 2,5 meter stroke was designed for…

Transfer lift of a platform module
Customer Challenge: Lifting of a platform structure from a barge onto a platform. Cranemaster Solution: Two Cranemaster units in series with SWL of 400 metric tons and 4,3 meter stroke. Cranemaster Quick Lift functionality was used to avoid re-contact after lift off.