Pile hammering for E.ON at the Rampion project
Customer Challenge: Pile run protection during installation of 116 monopiles at the Rampion Offshore Wind Farm Project off the south coast of England. Cranemaster Solution: Two Cranemaster shock absorbers with SWL of 1000 tons and 700 tons. Protecting the crane and rigging by reducing potential shock loads caused by sudden…
Pile run protection for Humber Gateway
Customer Challenge: Removal of dangerous peak loads in case piles are “running” during piling operations for the Humber Gateway monopile installations. Cranemaster Solution: Three Cranemaster shock absorbers in parallel configuration for pile run protection. The Results: More than 10 pile runs were experienced during the project, but due to the Cranemaster units,…