![Pile hammering for E.ON at the Rampion project](https://cranemaster.com/wp-content/uploads/2020/08/References-Rampion-Pilehammering-Offshorewind-01.jpg)
Pile hammering for E.ON at the Rampion project
Customer Challenge: Pile run protection during installation of 116 monopiles at the Rampion Offshore Wind Farm Project off the south coast of England. Cranemaster Solution: Two Cranemaster shock absorbers with SWL of 1000 tons and 700 tons. Protecting the crane and rigging by reducing potential shock loads caused by sudden…
![Pile run protection for Humber Gateway](https://cranemaster.com/wp-content/uploads/2020/08/References-offshore-windmill-installation-shock-absorber-1.jpg)
Pile run protection for Humber Gateway
Customer Challenge: Removal of dangerous peak loads in case piles are “running” during piling operations for the Humber Gateway monopile installations. Cranemaster Solution: Three Cranemaster shock absorbers in parallel configuration for pile run protection. The Results: More than 10 pile runs were experienced during the project, but due to the Cranemaster units,…