Installation of transition pieces at Greater Gabbard
Customer Challenge: Installation of transition pieces from floating vessels can be challenging. For the Greater Gabbard Offshore Wind Farm project off the UK coast, Jumbo Offshore therefore included Cranemaster for the installation of transition pieces. Cranemaster Solution: Two new Cranemaster units with SWL of 400 metric tons and 2,5 meter stroke was designed for…
Met mast installations in the North Sea
Customer Challenge: Stabilization of met masts when lowering through the splash zone. The structures have a height of 45 meters and weights of 300-400 metric tons. Cranemaster Solution: Two Cranemater units with SWL of 400 metric tons and 2,5 meter stroke were used in parallell configuration. The Results: For this project…