Find references by:
Installation of suction pile in deep water
Customer Challenge: Installation of a 50 metric tons suction pile for the Boabab Phase 3 project outside West Africa. Operations in deep water areas put strong demands on the equipment to be used. A common challenge when using passive heave compensators in deep water, is the deep water pressure pushing…
Mudmat safely installed in deep waters
Customer Challenge: Deployment of a large mudmat (13,75 x 13,75 meter) at 1788 meter water depth in the Gulf of Mexico. For ease of operation, the mudmat is deployed horizontally. Considerations to be handled by Cranemaster: The unit should have enough load capacity to support the dynamic loads during all…