Subsea 7 successfully installed protection covers in rough weather
Customer Challenge: Installation of GRP protection covers in rough weather in the Shetland waters for Subsea 7. Cranemaster Solution: A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke. The Results: Analysis was done upfront by Cranemaster, giving Subsea 7 a weather window of significant wave heights…
Jumbo installs structures for Ikhwezi project
Customer Challenge: Deployment of five subsea structures for PetroSA’s Ikhwezi project, offshore South Africa. Cranemaster Solution: Two Cranemaster units with SWL of 250 metric tons and 2,5 meter stroke. The Results: The installation of the five structures, weighing between 35 and 185 metric tons and measure up to 14 x…
Saipem project in the Gulf of Mexico
Customer Challenge: Installation of structures with large surfaces for Saipem in the Gulf of Mexico. Cranemaster Solution: A Cranemaster unit with SWL of 50 metric tons and 3 meter stroke. The Results: The Cranemaster unit successfully absorbed the forces through the splash zone, avoided resonance and reduced landing speed. The use…
Splash zone crossing of MWA module
Customer Challenge: Splash zone crossing of a Midwater Arch (MWA) for DOF Subsea at the Biendong Project in Vietnam. Cranemaster Solution: Cranemaster unit with SWL of 250 metric tons and 2,5 meter stroke.
Mudmat safely installed in deep waters
Customer Challenge: Deployment of a large mudmat (13,75 x 13,75 meter) at 1788 meter water depth in the Gulf of Mexico. For ease of operation, the mudmat is deployed horizontally. Considerations to be handled by Cranemaster: The unit should have enough load capacity to support the dynamic loads during all…