Customer Challenge:
Deployment of five subsea structures for PetroSA’s Ikhwezi project, offshore South Africa.
Cranemaster Solution:
Two Cranemaster units with SWL of 250 metric tons and 2,5 meter stroke.
The Results:
The installation of the five structures, weighing between 35 and 185 metric tons and measure up to 14 x 8 x 5 ½ meter, was executed by Jumbo’s DP2 Heavy Lift Vessel Fairplayer.
The Cranemaster units successfully removed the dynamic forces during all phases of the installation process. Cranemaster also carried out lift analysis for the project.