Installation work with Boskalis at the Wikinger OWF

Customer Challenge:

Reduction of risk and weather delays during installation of pre-piling template for Boskalis at the Wikinger Offshore Wind Farm.

Cranemaster Solution:

A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke.

Back to all references

Applications

Industry