Customer Challenge:
Reduction of risk and weather delays during installation of pre-piling template for Boskalis at the Wikinger Offshore Wind Farm.
Cranemaster Solution:
A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke.
Reduction of risk and weather delays during installation of pre-piling template for Boskalis at the Wikinger Offshore Wind Farm.
A Cranemaster unit with SWL of 600 metric tons and 3 meter stroke.