Customer Challenge:
Removal of dangerous peak loads in case piles are “running” during piling operations for the Humber Gateway monopile installations.
Cranemaster Solution:
Three Cranemaster shock absorbers in parallel configuration for pile run protection.
The Results:
More than 10 pile runs were experienced during the project, but due to the Cranemaster units, operations were not affected, and safety was not compromised.