Met mast installations in the North Sea

Customer Challenge:

Stabilization of met masts when lowering through the splash zone. The structures have a height of 45 meters and weights of 300-400 metric tons.

Cranemaster Solution:

Two Cranemater units with SWL of 400 metric tons and 2,5 meter stroke were used in parallell configuration.

The Results:

For this project Cranemaster also performed calculations and lift simulations. As proved in the simulations, the structures had to be stabilized when they were lowered through the splash zone. This was achieved by using Cranemaster.